Hot Sale Performance Cutting Machine
Use the lifting equipment to put the steel coil on the coil cart(weight is less than 8 ton)---double wimble uncoil machine---7 roller leveler machine---accumulator---measurement facility---hydraulic cutter---transporter---stow stand
1. Width of coil: 60-1320mm
2. Production capacity: Cutting 5-9 time/min; Max. Cutting speed: 10m/min
3. Total power of the equipment: 16kw
4. Cutting precision: Length: ≤ 0.5mm, diagonal: ≤ 1mm
6. Equipment introduction:
A: Coil cart driven by 3 in 1 motor, go up and down by hydraulic
B: Double wimble uncoil machine, no power urning, hydraulic driving, coil inner diameter 508-610mm
C: 7 roller leveler machine, 7 rollers leveling, motor speed sdjustment by change frequency
D: Measurement facility, the length and precision is controlled by A. C. Servo motor made in Japan
E: Hydraulic cutter use the up cut type hydraulic cutter avoid of injury the surface of the steel plate during the stowing
F: Transporter rollers conveyer
Ningbo Mengkwa Machinery Co.,Ltd is an experienced and professional manufacturer of plastic extruder and extrusion lines for years. We can produce various equipments, including plastic pipe extrusion lines, plastic profile extrusion lines, plastic sheet/plate extrusion lines and also some recycling and pelletizing machines etc. According to different requirement s of each customer, our engineers will provide most professional mechanical design and manufacturing, and the complete processing technology to meet their special application requirements.
If you want to know any information about us and machine or equipment, please contact with us at any time .
Ningbo Mengkwa Machinery Co. Ltd
Ningbo, China
web: mengkwa.en.made-in-china.com
mengkwa.en.made-in-china.com
After-sale service
1. 24 hours technical support by email, call, video.
2. Warranty for one year after 12 months of shipment
3. Installation and commissioning engineer will provide the tech long machine, and machine operation of the buyer's personnel on-site training, troubleshooting and machine maintenance. The factory offers free installation training for a week the company engineers, beyond a week, the salaries borne by the customer engineer the factory.
Terms of payment
1.after receiving the deposit 40%, our company will arrange production;
2.After the customer check and accept compression machine, before delivery, customer need to pay off the balance payment;