• Over Lap Welding Pex Al Pipe Making Extruder
  • Over Lap Welding Pex Al Pipe Making Extruder
  • Over Lap Welding Pex Al Pipe Making Extruder
  • Over Lap Welding Pex Al Pipe Making Extruder
  • Over Lap Welding Pex Al Pipe Making Extruder
  • Over Lap Welding Pex Al Pipe Making Extruder

Over Lap Welding Pex Al Pipe Making Extruder

Warranty: One Year
Product Type: PEX Pipe
Screw No.: Single-screw
Customization:
Shipping Cost:

Estimated freight per unit.

about shipping cost and estimated delivery time.
Payment Method: visa mastercard discover JCB diners club american express T/T
  Initial Payment Full Payment
Currency: US$
Return&refunds: You can apply for a refund up to 30 days after receipt of the products.
From payment to delivery, we protect your trading.
Over Lap Welding Pex Al Pipe Making Extruder pictures & photos
Over Lap Welding Pex Al Pipe Making Extruder
US $60,000 / Set
Min. Order: 1 Set
Diamond Member Since 2007

Suppliers with verified business licenses

Secured Trading Service
Manufacturer/Factory

Basic Info.

Model NO.
MWA
Automation
Automatic
Computerized
Computerized
Certification
CE
Customized
Customized
Condition
New
After-sales Service
Available
Export Market
Global
Delivery Time
45-60days
Size
Customized
Packing
Export Standard
Transport Package
Export Standard Packing, Wood Case
Specification
ordered
Trademark
mengkwa
Origin
Ningbo China
Production Capacity
1set/Month

Packaging & Delivery

Package Size
2500.00cm * 1200.00cm * 1200.00cm
Package Gross Weight
2000.000kg

Product Description

PEX Overlap Welding Aluminum-Plastic Composite Pipe Extrusion Line

Application & Features:
1.Aluminum pipe precise forming technology guarantees precise size and good roundnes
2.It adopts inner and outer pipe separately co-extrusion technology to improve the adhesion strength among layers and to inset smoother surface of the pipe 
3.The production line adopts the PLC control system and human-machine interface,easy to operate and with linkage function

Over Lap Welding Pex Al Pipe Making Extruder
Over Lap Welding Pex Al Pipe Making Extruder
products:

Over Lap Welding Pex Al Pipe Making Extruder
Over Lap Welding Pex Al Pipe Making Extruder


 
FAQ
1.Q:What is the machine warranty?
   A:one year.
2.Q:What is the production time while placing order?
   A:About 30 days
3.Q:What is the delivery time?
   A:Within 30 days after get the payment.
4.Q:Can your company handle shipping for customers?
   A:Yes.(Please provide us your requested seaport and we can check the shipping charge and arrange shipping for your order)
5.Q:Does the packing strong?
   A:Yes, of course! All of our export packing is with strong wooden pallets, all are confirmed  to export packing standard.
6.Q:How about after-sales service process?
   A:When your machine has problem, contact your sales and we will solve your problem as soon as possible.
7.Q:Are you manufacturer?
   A:Yes, we are manufacturer with about 20-year experience and profession.
8.Q:Do you have stock product to sell?
   A:Actually our machine need 20-30 days to manufacture, and there are many orders  from China and foreign countries, so we need custom one for you, and your order will be highly attention to manufacture.
9.Q:Do you inspect the finished products?
     A:Yes, we have QC department, they will inspect the machine before shipping, to
         ensure there is nothing problem of the machine .

 

01 WHY CHOOSE MENGKWA?
1) Mechanical and electric parts of machines for our machines are from famous brands with reliable and stable quality .

2) Machine structures and applicant parts are heavy duty type .
3) Technologies of machines are developing to be much more energy saving and higher production output .
4) Engineers for installation and training are both available in China and abroad .
5) Our after service is available in 24hours by team group to every customer .
6) Our machines reach to 54 countries all over the world since 1996 .

02 TERMS OF PAYMENT
30% deposit and 70% balance before shipment after machine testing approved by customer .

03 PACKING AND LOADING
Safe packing for container loading OR heavy duty iron frame fixing OR wood cases packages .

04 AFTER-SALE SERVICE
1) 24 hours technical support by email, call, video.
2) Warranty for one year after 12 months of shipment.
3) Installation and commissioning engineer will provide the tech long machine, and machine operation of the buyer's personnel on-site training, troubleshooting and machine maintenance. The factory offers free installation training for a week the company engineers, beyond a week, the salaries borne by the customer engineer the factory.

Over Lap Welding Pex Al Pipe Making ExtruderOver Lap Welding Pex Al Pipe Making ExtruderOver Lap Welding Pex Al Pipe Making ExtruderOver Lap Welding Pex Al Pipe Making Extruder


 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now