Customization: | Available |
---|---|
Type: | Tool Milling Machine |
Object: | Tool |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Parameter | Opening Milling Machine (3inch) | |
Cooling type (MWK-76L) | Electric Heating type(MWK-76) | |
Roller | actual using length≈ 15cm, (φ 76mm× L 150mm) |
|
Ratio | 1: 1.16, actual 8.6: 10rev. /min. | |
Temperature | Normal temperature-tap water | max: normal +10--300 adjustable |
Temperature control | Temperature controller is using high precisoin P I D intelligent microcomputer control system , higher precisoin than manual setting; with over-temperature warning function to protect machine and production material |
|
Motor | 0.3HP, opening could be adjustable; normal opeing0.2-3mm | 0.5HP, opening could be adjustable; normal opeing0.2-3mm |
Safety system | brake safety rail, finger touch to stop and revese at some angle; safety rail is on the above of the wheel; emergeny stop rail is supported by spring | brake safety rail, finger touch to stop and revese at some angle; safety rail is on the above of the wheel; |
Machine dimension | 80*40*50cm | 80*40*40cm |
Machine weight | within 80kg | within 100kg |
Machine structure | Steel plate; ( more light than traditional casting iron, small dimension, high mechanical strength and good toughness ) |
Roller Stand has security protective cover, refusing sundries enter and avoiding manpower injury. There are two wear-resistant high-temperature profiles at the two ends of roller for the flexible adjusting for width. Any qty of refining rubber could be achieved. Little refining rubber: adjust to the middle/ Much refining rubber: adjust to both sides. |
Power | 2φ , AC220V, 3A | |
Power | 50W | |
Motor | Taiwan | |
Relay | Japan OMRON | |
Roller material | Japan SKD die steel |
01 WHY CHOOSE MENGKWA?
1) Mechanical and electric parts of machines for our machines are from famous brands with reliable and stable quality .
2) Machine structures and applicant parts are heavy duty type .
3) Technologies of machines are developing to be much more energy saving and higher production output .
4) Engineers for installation and training are both available in China and abroad .
5) Our after service is available in 24hours by team group to every customer .
6) Our machines reach to 54 countries all over the world since 1996 .
02 TERMS OF PAYMENT
30% deposit and 70% balance before shipment after machine testing approved by customer .
03 PACKING AND LOADING
Safe packing for container loading OR heavy duty iron frame fixing OR wood cases packages .
04 AFTER-SALE SERVICE
1) 24 hours technical support by email, call, video.
2) Warranty for one year after 12 months of shipment.
3) Installation and commissioning engineer will provide the tech long machine, and machine operation of the buyer's personnel on-site training, troubleshooting and machine maintenance. The factory offers free installation training for a week the company engineers, beyond a week, the salaries borne by the customer engineer the factory.