HDPE Spiral Corrugated Pipe Extrusion Line
Product introduction:
At present, the sewage and drainage system still use the cement pipe. However, due to its instable chemical property ab\nd loose cionnection . It has become the principle cause for environment pollution.
On the other hand ,the cast iron pipes cant not be used any more for the disadvantages, such as the inconvenient and expensive cost. In recent years, the plastic pipes become successful substitute to the cement pipes. Especially the newly developed spiral large diameter plastic pipes have been drawn great.
Main Technical Parament:
pipe range(mm) |
extruder model |
extruder model
power(kw) |
total installation
power(kw) |
MAX.output
(kg/h) |
dimension
L*W*H(M) |
200-800 |
SJ65*32
SJ45*30 |
45
22 |
150 |
200 |
15*20*2.5 |
400-1200 |
SJ60*33
SJ45*33 |
75
30 |
210 |
400 |
15*22*2.5 |
800-1800 |
SJ75*33
SJ45*33 |
90
30 |
320 |
500 |
21*25*3 |
1600-2600 |
SJ90*33
SJ60*33 |
160
75 |
400 |
700 |
30*25*3.5 |
2000-3200 |
SJ120*33
SJ75*33 |
250
90 |
540 |
1100 |
32*28*4 |
Ningbo Mengkwa Machinery Co.,Ltd is an experienced and professional manufacturer of plastic extruder and extrusion lines for years. We can produce various equipments, including plastic pipe extrusion lines, plastic profile extrusion lines, plastic sheet/plate extrusion lines and also some recycling and pelletizing machines etc. According to different requirement s of each customer, our engineers will provide most professional mechanical design and manufacturing, and the complete processing technology to meet their special application requirements.
If you want to know any information about us and machine or equipment, please contact with us at any time .
Ningbo Mengkwa Machinery Co. Ltd
Ningbo, China
web: mengkwa.en.made-in-china.com
mengkwa.en.made-in-china.com
After-sale service
1. 24 hours technical support by email, call, video.
2. Warranty for one year after 12 months of shipment
3. Installation and commissioning engineer will provide the tech long machine, and machine operation of the buyer's personnel on-site training, troubleshooting and machine maintenance. The factory offers free installation training for a week the company engineers, beyond a week, the salaries borne by the customer engineer the factory.
Terms of payment
1.after receiving the deposit 40%, our company will arrange production;
2.After the customer check and accept compression machine, before delivery, customer need to pay off the balance payment;