Plastic Zipper Bag Extruder Machine
Introduction of machine:
Our machine is designed and manufactured according to foreign advanced technology. It chooses the LDPE, HDPE and other plastic materials, specially produce wear belt type garbage bags or BOPP, PP flat bags
.This machine is applied to manufacturing and printing the uncolored vest bags made of HDPE, LDPE roll film. It adopts PLC control, double servo motor fixed length and the liquid crystal touch screen actual display to finish the feeding, sealing, cutting, punching holes and transporting only in one process. It is of high degree of automation and good economic result.
MODEL |
MWK-700DF |
MWK-900DF |
MWK-1200DF |
Bag Length |
900 |
1000 |
1200 |
Bag width |
650 |
850 |
1100 |
Bag making thickness |
0.008-0.12 |
0.008-0.1 |
0.009-0.1 |
speed of making |
30-120 |
30-120 |
30-100 |
Total power |
3.5 |
4.5 |
6 |
machinery weight |
950 |
1150 |
1300 |
dimension |
3100× 1400× 1600 |
3100× 1600× 1600 |
3300× 1900× 1800 |
Ningbo Mengkwa Machinery Co.,Ltd is an experienced and professional manufacturer of plastic extruder and extrusion lines for years. We can produce various equipments, including plastic pipe extrusion lines, plastic profile extrusion lines, plastic sheet/plate extrusion lines and also some recycling and pelletizing machines etc. According to different requirement s of each customer, our engineers will provide most professional mechanical design and manufacturing, and the complete processing technology to meet their special application requirements.
If you want to know any information about us and machine or equipment, please contact with us at any time .
Ningbo Mengkwa Machinery Co. Ltd
Ningbo, China
web: mengkwa.en.made-in-china.com
mengkwa.en.made-in-china.com
After-sale service
1. 24 hours technical support by email, call, video.
2. Warranty for one year after 12 months of shipment
3. Installation and commissioning engineer will provide the tech long machine, and machine operation of the buyer's personnel on-site training, troubleshooting and machine maintenance. The factory offers free installation training for a week the company engineers, beyond a week, the salaries borne by the customer engineer the factory.
Terms of payment
1.after receiving the deposit 40%, our company will arrange production;
2.After the customer check and accept compression machine, before delivery, customer need to pay off the balance payment;