Customization: | Available |
---|---|
Type: | Injection Blow Molding |
Structure: | Horizontal |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
ITEMS | UNIT | MC-250 | MC-400 | |||||
60SU | 90SU | 130SU | 130SU | 160SU | 220SU | |||
Injection Unit | Screw Diameter | mm | 32 | 35 | 40 | 40 | 45 | 50 |
L/D Screw L/D Ratio | L/D | 21 | 21 | |||||
Theoretical injection Pressure | Mpa | 184.6 | 198.9 | 189.9 | 184.6 | 198.9 | 189.9 | |
Theoretical Shot Volume | cm³ | 92 | 164 | 251 | 251 | 350 | 491 | |
Injection Stroke | mm | 115 | 170 | 200 | 200 | 220 | 250 | |
(PS) Shot Weight of Injection (PS) | g | 85 | 150 | 231 | 231 | 322 | 452 | |
(PS) Plasticizing capacity (PS) | g/s | |||||||
Injection Rate | g/s | |||||||
Calculated Maximum Screw Speed | r/min | 600 | 450 | 446 | 420 | 400 | 355 | |
Nozzle Stroke | mm | 350 | 350 | 450 | 450 | 450 | 500 | |
Nozzle Contact Force | KN | 27 | 39 | 39 | 39 | 53 | 70 | |
Hopper Capacity | cm³ | 28 | 28 | 40 | 40 | |||
No. OF Temperature | 4+1 | 530/140 | ||||||
Type of Nozzle | Open | 1+1 | ||||||
DOUBLE TOGGLE | DOUBLE TOGGLE | |||||||
Clamping Unit |
Mould Clamping Force | KN | 2500 | 4000 | ||||
Max. DAYLIGHT | mm | 885 | 1246 | |||||
Mould Clamping Stroke | mm | 435 | 596 | |||||
Mould Thickness | mm | 180-450 | 300-650 | |||||
Space Between Tie Bars(H*V) | mm | 795*440 | 1020*620 | |||||
Mould Plates Size (H*V) | mm | 1000*705 | 1295*995 | |||||
Distance Between Nozzle | mm | 400 | 500 | |||||
Ejector Force/Stroke | KN/mm | 270/120 | 530/140 | |||||
No. of Ejector pins | 1+1 | 1+1 | ||||||
Others | Pump Driving Motor | kw | 18.55+18.5 | 30+30 | ||||
Heating Power | kw | 6.9 | 7.7 | 9.9 | 9.9 | 12.0 | 15.9 | |
Max. Pump Pressure | MPa | 14 | 14 | |||||
Machine Weight | ton | 8.8 | 16.3 | |||||
Oil Reservoir Capacity | L | 430 | 766 |
01 WHY CHOOSE MENGKWA?
1) Mechanical and electric parts of machines for our machines are from famous brands with reliable and stable quality .
2) Machine structures and applicant parts are heavy duty type .
3) Technologies of machines are developing to be much more energy saving and higher production output .
4) Engineers for installation and training are both available in China and abroad .
5) Our after service is available in 24hours by team group to every customer .
6) Our machines reach to 54 countries all over the world since 1996 .
02 TERMS OF PAYMENT
30% deposit and 70% balance before shipment after machine testing approved by customer .
03 PACKING AND LOADING
Safe packing for container loading OR heavy duty iron frame fixing OR wood cases packages .
04 AFTER-SALE SERVICE
1) 24 hours technical support by email, call, video.
2) Warranty for one year after 12 months of shipment.
3) Installation and commissioning engineer will provide the tech long machine, and machine operation of the buyer's personnel on-site training, troubleshooting and machine maintenance. The factory offers free installation training for a week the company engineers, beyond a week, the salaries borne by the customer engineer the factory.