PEX Overlap Welding Aluminum-Plastic Composite Pipe Extrusion Line
Application & Features:
1.Aluminum pipe precise forming technology guarantees precise size and good roundnes
2.It adopts inner and outer pipe separately co-extrusion technology to improve the adhesion strength among layers and to inset smoother surface of the pipe
3.The production line adopts the PLC control system and human-machine interface,easy to operate and with linkage function
products:


Alumium-Plastic Compound Pipe Extrusion Line
Application & Suitable Scale
The line is used in producing aluminum-plastic compoundpipe material, the aluminum pipe adopts ultrasonic welding and common-extruding one-step shaping. The produced aluminum-plastic compound pipe is widely used in cold and hot tap-water, all kinds of liquid acid and alkali salt gas, oxygen, compressed air and others.
Application & Features:
1. High degree of automation, across the board using PLC control, to ensure process parameters are in place.
2. Low operating strength, simple operation
3. The devices are based on the material properties, aluminum-plastic composite pipe production characteristics, special design and special processing to ensure the reliable performance improvement
4. The process can illustrate that main trunk is high precision tube forming line, when aluminum coil rolled by passive unreeling machine, the flat aluminum strip is gone through various positioning mechanism and gone into feeding preforming roller track, the aluminum strip is rolled into a tube shape and then fed into the forming section. Aluminum strip formed by forming section, aluminum tubes are only the general precision. After this, they must be passed through the fixed diameter section integer, the localization, and the requirements of accuracy. About aluminum composite parts, they are used into ultrasonic welding by ultrasonic welding machine to form into closed high strength aluminum tubes.
Aluminum welding area of production line is confluence nodes branched. The other two branch area is the inner tube and the inner adhesive layer: outer tube, outer adhesive layer. After feeding, melting, extrusion, confluence into the template and formed by the confluence of distribution, and then enters the inner tube and the outer tube co-extrusion die extrusion. The composite tube always injecting compressed air to detect pipeline pressure, and after a cold bath setting, automatic drying, measuring length, it will enter the printing area to print the company name, pipe size, length of print on the pipe by using automatic ink jet printers, . After the traction of printed pipes, they will be rolled and wrapped up by automatic double disc rolling machine, when rolled pipes are up to standard, they can be packed to leave the factory.
Technical Standards:
Produced Pipe Specification: |
φ16-φ32mm |
The tiickness of aluminium belt: |
0.2-1mm |
Production line Speed: |
3-7m/min |
Annual out-put per set of machine: |
two millions of meters |
|
|
|
|
|
|
|
|
01 WHY CHOOSE MENGKWA?
1) Mechanical and electric parts of machines for our machines are from famous brands with reliable and stable quality .
2) Machine structures and applicant parts are heavy duty type .
3) Technologies of machines are developing to be much more energy saving and higher production output .
4) Engineers for installation and training are both available in China and abroad .
5) Our after service is available in 24hours by team group to every customer .
6) Our machines reach to 54 countries all over the world since 1996 .
02 TERMS OF PAYMENT
30% deposit and 70% balance before shipment after machine testing approved by customer .
03 PACKING AND LOADING
Safe packing for container loading OR heavy duty iron frame fixing OR wood cases packages .
04 AFTER-SALE SERVICE
1) 24 hours technical support by email, call, video.
2) Warranty for one year after 12 months of shipment.
3) Installation and commissioning engineer will provide the tech long machine, and machine operation of the buyer's personnel on-site training, troubleshooting and machine maintenance. The factory offers free installation training for a week the company engineers, beyond a week, the salaries borne by the customer engineer the factory.



