PVC Fiber Reinforced Braided Pipe/Shower Pipe Extrusion Line
Application and Features:
Braiding reinforced composited tube is three layers structure. The inner and outer layers are made of Polymer (PE,PVC,PA,PU etc), and the middle layer is mainly made of fiber braiding reinforced net. This kind of tube is suitable for the conveying of high pressure gas or liquid. It can be widely used in the fields of machinery, coal mine, oil, chemical plant, agricultural irrigation, building, solar water heater, coal gas pot etc.
In order to save the cost of equipment investment, we can adopt one set of extruder with dies and auxiliary equipments to realize producing braiding reinforced tube by step-by-step production technology.
1. Braided tube making flow chart as follow:
Stage 1: Inner tube extrusion
Inner Material extrusion → Tube die → Cooling → Pulling → inner tube reeling
Stage 2: Braiding
Inner tube unreeling → Braiding → braided tube reeling
Stage 3: Outer tube coated extrusion
Braided tube unreeling → Outer Material extrusion → Tube coated die → Cooling → Pulling → final tube reeling
Braided tube unreeling
→ Outer Material extrusion
→ Tube coated die
→ Cooling
→ Pulling
→ final tube reeling
2. Technical parameters of Braided tube making machine:
Model |
SJ-45 |
SJ-65 |
SJ-90 |
Extruder model |
SJ-45 |
SJ-65 |
SJ-90 |
Processing tube range(mm) |
6-12 |
8-32 |
16-50 |
Output (Kg/h) |
35-65 |
35-80 |
30-50 |
Install power (KW) |
39.3 |
66.3 |
78.5 |
Consuming power (KW) |
27.5 |
39 |
52 |
MACHINE LIST :
No. |
Name |
1 |
Desiccant dryer |
2 |
Single screw extruder |
3 |
Bottle tube mould |
4 |
Vacuum tank |
5 |
Haul-off |
6 |
Yarn braider |
7 |
Desiccant dryer |
8 |
Single screw extruder |
9 |
Cloth-wrappers mould |
10 |
Cooling tank |
11 |
Haul-off: |
12 |
Cutter |
13 |
Ink printer |
14 |
Double position winder |
the machine line photos for reference :
01 WHY CHOOSE MENGKWA?
1) Mechanical and electric parts of machines for our machines are from famous brands with reliable and stable quality .
2) Machine structures and applicant parts are heavy duty type .
3) Technologies of machines are developing to be much more energy saving and higher production output .
4) Engineers for installation and training are both available in China and abroad .
5) Our after service is available in 24hours by team group to every customer .
6) Our machines reach to 54 countries all over the world since 1996 .
02 TERMS OF PAYMENT
30% deposit and 70% balance before shipment after machine testing approved by customer .
03 PACKING AND LOADING
Safe packing for container loading OR heavy duty iron frame fixing OR wood cases packages .
04 AFTER-SALE SERVICE
1) 24 hours technical support by email, call, video.
2) Warranty for one year after 12 months of shipment.
3) Installation and commissioning engineer will provide the tech long machine, and machine operation of the buyer's personnel on-site training, troubleshooting and machine maintenance. The factory offers free installation training for a week the company engineers, beyond a week, the salaries borne by the customer engineer the factory.