Customization: | Available |
---|---|
Type: | Pipe Extruder |
Plastic Processed: | PE |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
High Efficient Extruder
This high efficient extruder of this PE-AL-PE pipe line is specially independently designed by MENGKWA company.It includes
Inner PE Layer Extruder,
Inner Glue Layer Extuer,
Outer PE Layer Extruder,
Outer Glue Layer Extruder
Ultrasonic Welding Machine
The Aluminum tube was sealed by ultrasonic welding, which adopts high well-known brand welder, with even and strong welding seam.
Aluminum pipe forming moulds
The technology has been further developed based on original production machine technology.
The Aluminum pipe forming molds and co-extrusion die head molds have been optimized and manufactured by imported high precise CNC machine, which have greatly increased the pipe forming accuracy and production speed.
PLC control system
The PE-AL-PE Pipe Extrusion Line adopts original Siemens new generation PLC control system with full color screen, which ensures the high speed synchronous control and reliable operating of the whole production line.
Manufactured PE-AL-PE Gas Pipe
The PE AL PE GAS PIPES is a product that imposing very quickly and in very short time. It will be the material with more participation in the construction of Gas systems.
The reasons lies in:
The acceptance by the Gas Distribution Companies
As material, PE-AL-PE PIPES is much more economical than copper, and it is almost the same cost of galvanized steel pipes; Much easier to install, whole system will take 1-2 hours to complete, no need of heavy tools, installation workers can learn fast and save energy; The flexibility of the pipe has the advantage of NO fittings needed in every change of directions, avoid possibility of gas leaking & save cost.
The minimun life time is 50 years.
01 WHY CHOOSE MENGKWA?
1) Mechanical and electric parts of machines for our machines are from famous brands with reliable and stable quality .
2) Machine structures and applicant parts are heavy duty type .
3) Technologies of machines are developing to be much more energy saving and higher production output .
4) Engineers for installation and training are both available in China and abroad .
5) Our after service is available in 24hours by team group to every customer .
6) Our machines reach to 54 countries all over the world since 1996 .
02 TERMS OF PAYMENT
30% deposit and 70% balance before shipment after machine testing approved by customer .
03 PACKING AND LOADING
Safe packing for container loading OR heavy duty iron frame fixing OR wood cases packages .
04 AFTER-SALE SERVICE
1) 24 hours technical support by email, call, video.
2) Warranty for one year after 12 months of shipment.
3) Installation and commissioning engineer will provide the tech long machine, and machine operation of the buyer's personnel on-site training, troubleshooting and machine maintenance. The factory offers free installation training for a week the company engineers, beyond a week, the salaries borne by the customer engineer the factory.